Progress This Week

This week was a big one because the hardwood ash floors and stairs were sanded and finished. They look fantastic but also will allow a lot of things to happen in sequence.

First, the builders will be able to start adding baseboards to all of the rooms upstairs. The painter is standing by to start painting and finishing those. As these complete, they will be able to install the doors and add second coats of paint to many of the walls. In most of the rooms upstairs, once that is done the electrician can add the outlets and light switches and they are complete. This would be the case for the guest bedroom, the heated storage room and the kid’s bedroom.





Downstairs, the library shelving is installed so that room is ready for drywall touchups, re-priming and a second coat. The outlets and light fixtures need to be installed and then that room will be complete as well. The mudroom is waiting for brackets and hanging pegs as well as some detail work on the plaster walls before it can be considered done but it is almost there.

The kitchen is in a state of limbo right now because we are waiting for granite countertops. We can’t install shelving because the tile sits on top of the countertops and the spacing for the shelves is dependent on finish tile backsplashes. It is going to be interesting to watch them coordinate the carpentry and tiling during that phase. Getting the counters as soon as possible is critical path to finishing the build and that is one of the big questions right now – when are they going to be cut and finished. We are in a queue and completely dependent on the countertop cutter’s schedule.

The granite is also holding up the heated bench next to the fireplace and both bathrooms so the goal this week is to get as many task list items to the point where things can charge ahead once those countertops arrive. It could be as early as two weeks from now or as late as five weeks from now.






The concrete porch on the south and west sides of the house is complete with the stress lines cut and wood having been removed. We sat on it yesterday when we ate lunch and it was great. Very quiet. The landscaping company now has to return (one to two weeks?) and spread the rest of the topsoil and put in the north and south drip edges. They are also going to move the remaining dirt piles and scattered rocks, remove a tree killed during the septic preparation, and prep the area for the slab needed for the porch area on the north near the summer porch. We expect some of the trailers and vehicles to start moving out of the front “yard” area soon to get ready for the landscaping process since we’ll also be getting the driveway done around the same time.

This week, weather permitting, they are going to sand and finish the summer porch and breezeway. The concrete guys will have to return once the landscaping is done to pour the stairs on the south and the aforementioned patio on the north.

No news yet on the solar install but hopefully that happens this month.

There is still a lot to do but I’m starting to see a path to move-in. Lots has to happen between now and then though. Wish us luck.