• Well is Dug 2020-09-30 12:00 AM

    Our builder today informed us that the well-diggers showed up and dug the well. It went fairly quickly and we ended up with a well at 200ft ... read more

  • Woodcutting Weekend 2020-09-27 12:00 AM

    This weekend we went up to the land to see how things were doing. We didn’t get to see the slab because it didn’t get poured on Friday as ... read more

  • Getting Close to a Floor 2020-09-24 12:00 AM

    We are hoping to get the slab poured this week and we may still be on track for it. The builder told me the plan is hopefully to do ... read more

  • Concrete Slab Soon 2020-09-23 12:00 AM

    The builders have poured the concrete footers and frost walls and then moved on to installing the EPS foam that will serve as additional ... read more

  • Wall Forms and Concrete 2020-09-13 12:00 AM

    Now that the footers are completed, the next step is to pour the frost walls that run most of the way around the site. There are some parts ... read more

  • Septic and Concrete 2020-09-07 12:00 AM

    I had a quick conversation with the builder today and he mentioned that the septic system is in. They are pushing to pour and strip the ... read more

  • Foam and Foundation Start 2020-09-03 12:00 AM

    We have gotten a few pictures from our builder indicating that the concrete footer layout has started. He continues to do the foam cutting ... read more

View all of the posts in the archive, browse the tags, or subscribe to the feed for All Posts.